Duba Green Solar Integrated Power Plant


Tabuk

Duba Green Solar Integrated Power Plant, Tabuk / KSA

 

Owner: Saudi Electricity Company

Client: Al-Saad General Contracting

Project Value:  SR. 10 Mio.

Construction Period:  5 Months (recently completed)

Type of project:  Solar Power Plant

Scope of Works

A: D-wall construction 1000 mm, 33 Panels, area 5,756 m2

B: Permanent Anchors (7,150 l/m), length ranging from 25.0 m – 31.0 m, 264 Nos.